top of page

PROJECT 4

ROMAVE TLALNEPANTLA CEDIS BACHOCO 2022
Construction site:
- Feeder from electrical room on platform to electrical room 2 CEDIS BACHOCO TLALNEPANTLA. Disc cutting, excavations, formwork PAD pipe assembly, 250 kg/cm2 concrete, Single-channel and threaded rod support, Conduit installation, Galvanized thick wall, Three-phase feeder wiring, Assembly and styling of i-line board

bottom of page
